Which of the following components of the systems model provides information for the system to adjust its function according to the provided information?
a) Input
b) Feedback
c) Output
d) Process
Which of the following components of the systems model includes resources such as energy, capital, people, materials, tools and machines, time, and information?
a) Input
b) Feedback
c) Output
d) Process
Which of the following is a feedback mechanism for a system?
a) The power LED light on a computer monitor
b) The temperature setting knob on a refrigerator
c) The progress bar when downloading a file on iTunes
d) The alarm on an alarm clock
Which of the following is an output of an email communication system?
a) The computer used by the person sending the email
b) The modem used for Internet connection
c) The person sending the email
d) The sent email
Which of the following is an example of a closed system?
a) A clothes dryer
b) A microwave
c) A coffeepot
d) A motion-detecting exterior light
The Universal system model consists of:
a) Input, Process, Output, Feedback
b) Input, Project, Outfit, Feedback
c) Input, Process, Output, Friend
d) Internet, Protocol, Outstanding, Free
The feedback loop would be which of the following examples
a) A company takes information from a user survey and uses it to make the product better.
b) Bob enjoys construction
c) Tom built a house out of popsicle sticks
d) A company finds that their employee is making false statements about them.
What is an example of a system input.
a) Bob goes to Lowe's to buys materials for a project.
b) The building on 34th street was just completed
c) Tom is nailing a 2x4 together
d) Harvey is washing a blade that was used to cut tile.
The process in the Universal System Process is.
a) Bob goes to Lowe's to buys materials for a project.
b) The building on 34th street was just completed
c) Tom is nailing a 2x4 together
d) All of the above
A OUTPUt in the Universal Systems Process is:
a) Bob goes to Lowe's to buys materials for a project.
b) The building on 34th street was just completed
c) Tom is nailing a 2x4 together
d) All of the above
Play Games with the Questions above at ReviewGameZone.com
To play games using the questions from above, visit ReviewGameZone.com and enter game ID number: 11882 in the upper right hand corner or click here.
To play games using the questions from above, visit ReviewGameZone.com and enter game ID number: 11882 in the upper right hand corner or click here.
TEACHERS / EDUCATORS
Log In | Sign Up / Register
Log In | Sign Up / Register