Review Game Zone
Games
Test
Preview
Back
Match it!
Match it! Select the correct answer from the pull down...Good luck!
If it takes a force of 2000N to move a crate at a rate of 3.4 m/s/s, what is the mass of the object?
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
To complete a project, 200,000 Joules of work are needed. the time taken to complete the project is 20s. How much power is needed?
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
The correct equation for power is -
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
Force x distance is the formula for -
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
What is being performed when a force is used to move an object a distance?
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
A car manufacturer reduces the mass of a car 250kg. If the new design is identical to the old design, how will the new car compare to the old car?
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
A student pushes a grocery cart with a 32.1N moving it 15.7m. How much work was done?
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
The amount of work completed in a certain amount of time is
588.2kg
10,000 J/s
work
power
504.0J
work
It will need less force to move.
work/time
Check it!