The overall blueprint for a project including objectives, course outline, flowchart, storyboards, etc. is the?

A visual/picture representation of a project is called a?

The phase of the ADDIE model that includes such activities as writing the course outline, deciding on color schemes and

Which phase of the ADDIE model are alpha and beta tests conducted?

Which phase of the ADDIE model examines the needs of the project, learning gaps, and other activities such as the audience

Which phase of the ADDIE model are the first depth and first breadth prototypes created?

The design of one complete screen, page, frame, etc. of a multimedia project is called a? The purpose is to show the color

The skeleton design that shows the overall flow of a project with navigation etc. is called a? Sections do not need to be

The steps to the ADDIE design model are?

Which of the following procedures are NOT performed during the Analyze phase of the ADDIE model?

Which of the following procedures are NOT performed during the design phase of the ADDIE model?

SME means?

Which of the following procedures are NOT performed during the develop phase of the ADDIE design model?

Which phase of the ADDIE model should require the most time to complete?

Which of the following procedures are NOT performed during the implement phase of the ADDIE design model?

An alpha test is typically conducted with in-house personnel with the help of the SME to insure technical and instructional

A beta test is typically conducted with outside target audience participants to insure usability of the project.

The Beta test is usually conducted before the alpha test.

Which of the following procedures is NOT performed during the evaluate phase of the ADDIE model?

Who is responsible for insuring that the project is completed on time and within budget?